Commercial

Kearney Catholic High School Gym Addition

kchs_gym.jpgkchs_gym_high.jpgkchs_lobby.jpgkchs_weight_room.jpgkchs_wrestling.jpg

The Kearney Catholic High School gymnasium was a 28,000sf addition to the existing school facility. This was a design/build project where Kelly Electric was contracted to design and install the electrical systems for the addition. We worked closely with the school to incorporate their wants and needs for the new facility all while working to stay within the budget parameters. Some project highlights include:


  • International Energy code analysis and compliance design
  • Energy efficient T5 high bay light fixtures in the gym with dual level switching
  • Gynamsium lighting analysis and design for sporting events
  • Asthetic exterior and entrance lighting design


« Back to Projects